Building Permit Required
No person or corporation shall locate, erect, construct, enlarge, alter, repair, demolish, or relocate any building or change the type of occupancy without obtaining the required permits for the specific work from the Inspections Department having jurisdiction.
Electrical Permit Required
An electrical permit is required for the installation, extension, alteration, or general repair of any electrical wiring, devices, appliances, or equipment except that in any one or two-family dwelling units, a permit shall not be required for repair or replacement of electrical lighting fixtures or devices, such as receptacles and lighting switches having the same voltage and the same or less amperage as long as the work is performed by a person licensed under G.S.87-43.
Plumbing Permit Required
A plumbing permit is required for any plumbing system installation, extension, relocation, replacement, or general repair. Plumbing permits shall not be required for minor repairs or replacements of plumbing fixtures, provided such repairs or replacements do not disrupt the original water supply, the waste, or the ventilation system.
Mechanical/HVAC Permit Required
Mechanical/HVAC permit is required for the installation, extension, relocation, replacement and general repair of any heating, air-conditioning or venting system. A PTAC (Package Terminal Air Conditioner) requires a mechanical permit be obtained before installation; however, a licensed mechanical contractor is not required to install the unit. If any electrical wiring is added for the unit, an electrical permit will be required as well. A licensed electrician would be required for the wiring.
A permit is required to convert a gas appliance to a different type of gas, such as converting a Liquid Propane (LP) appliance to natural gas.